Request a quote
Call us 074-33352020

Project

Completed

Steel frame of the Ghaem Hospital, Bushehr

Steel weight
850t
Duration
120days
Year
2020
Location
Bushehr

About the project

Shop drawings, factory fabrication, delivery and erection of the steel structure in Bushehr by Sadat Yasuj Industrial Manufacturing Complex.

Technical details

  • Structure weight: 850 t
  • Structure type: Bolted, with CO₂ and submerged-arc welding
  • Build time: 120 days
  • Client: Safat Engineering Group