Request a quote
Call us 074-33352020

Project

Completed

Emergency building, Shirkhorshid Hospital, Abadan

Steel weight
480t
Duration
50days
Location
Abadan

About the project

Shop drawings, factory fabrication, delivery and erection of the steel structure in Abadan by Sadat Yasuj Industrial Manufacturing Complex.

Technical details

  • Structure weight: 480 t
  • Structure type: Welded moment connections; CO₂, submerged-arc and electroslag welding
  • Build time: 50 days