Request a quote
Call us 074-33352020

Project

Completed

Sisakht boarding school

Steel weight
270t
Duration
40days
Location
Sisakht

About the project

Shop drawings, factory fabrication, delivery and erection of the steel structure in Sisakht by Sadat Yasuj Industrial Manufacturing Complex.

Technical details

  • Structure weight: 270 t
  • Structure type: Bolted, flanged pinned connections
  • Build time: 40 days