Request a quote
Call us 074-33352020

Project

Completed

20 × 38.5 m arched shed and side building

Steel weight
64t
Dimensions
20 × 38.5 m
Duration
35days
Year
2023

About the project

Shop drawings, factory fabrication, delivery and erection of the steel structure in Yasuj, Deh Baraftab village by Sadat Yasuj Industrial Manufacturing Complex.

Technical details

  • Structure weight: 64 t
  • Structure type: Bolted, with CO₂ and submerged-arc welding
  • Size: 20 × 38.5 m
  • Build time: 35 days
  • Client: Provincial School Renovation Authority